INK 2 / FLUX TURN-CONTRACT REVIEW Free evaluation worksheet | Checked October 16, 2026 Status: UNPERFORMED. No API benchmarks or calls were run for this resource. Native Burki Ink 2 selection was not verified. Flux catalog availability is not a completed provider invocation. Use the current provider contract and authorized funding before any actual test. 1. STATE THE DECISION Which application behavior must remain correct? _____________ Recognition-only comparison or full delivered voice path? ___ Caller language and accent coverage: _______________________ Permissions for source audio / synthetic fixture: ___________ No sensitive caller data or private replay material required. 2. FREEZE EACH CONFIGURATION Provider / exact requested model: __________________________ Returned model revision if present, otherwise unknown: ______ Endpoint and manual/automatic turn ownership: _______________ API/SDK version and application source revision: ____________ Region / date / audio hash / channel / encoding: ____________ Sample rate / packet pacing / connection policy: ____________ Complete threshold and timeout settings: ___________________ Finalization and close behavior: ___________________________ Retries, failed requests and billing policy: ________________ Repeat for the second provider. Equal slider numbers do not mean equal operating points. 3. ORIGINAL ENGLISH FIXTURE “I need the details for B seven… four, not B seventeen. Can someone explain the room layout?” Use the same authorized recorded input for both recognition paths if performing a paired comparison. Preserve the pause and correction. Record actual timing rather than inventing event positions from the written punctuation. Expected business meaning: Requested reference: B74 Superseded interpretation: B17 Room layout: unknown until an approved source or staff supplies it No booking, availability decision or staff action is established. 4. RECORD ACTUAL EVENTS Do not fill this with the expected sequence and label it observed. Time | Connection | Local turn | Event | Current full text | Draft generation ____ | __________ | __________ | _____ | _________________ | ________________ ____ | __________ | __________ | _____ | _________________ | ________________ ____ | __________ | __________ | _____ | _________________ | ________________ Early indication received? ______ Continuation received? ____ Obsolete generation / cancellation evidence: ________________ Late result discarded before speech/action? ________________ Final recognized words / correct business meaning: __________ Readback and caller confirmation evidence, if required: _____ Action attempted / result / no action / unknown: ____________ 5. CASES AND EXPECTATIONS A. Pause inside the reference, then continue. Expected: the incomplete draft cannot commit a business action. Actual / failure / correction: _____________________________ B. Old draft A finishes after B becomes current. Expected: A is discarded, with no late speech or action. Actual / failure / correction: _____________________________ C. No early event occurs. Expected: the final-turn path still produces a coherent reviewable result. Actual / failure / correction: _____________________________ D. Caller corrects a previously spoken identifier. Expected: final meaning uses the correction; earlier words remain auditable. Actual / failure / correction: _____________________________ E. Disconnect or close arrives with work pending. Expected: old-connection work cannot be attached to a new turn. Actual / failure / correction: _____________________________ F. Error or missing usable transcript. Expected: count the failure separately; do not silently drop it from quality or cost totals. Actual / failure / correction: _____________________________ 6. SEPARATE MEASURES Reference words and normalization policy: __________________ WER numerator / denominator / uncertainty: _________________ Time to first text definition and coverage: _________________ Time to final text definition and coverage: _________________ Natural endpoint precision/recall evidence, if measured: ____ Application reply start / caller-heard timing, if measured: __ Failed / attempted / usable / retried counts: _______________ Do not turn text timing into full-agent response latency. 7. CURRENT COST AND REVIEW Account rate / plan / currency / date: _____________________ Recognition / speculative LLM / generated voice / platform / carrier components: __________________________________________________________ Measured spend versus assumed estimate: ____________________ Accepted / rejected / unresolved and evidence: ______________ Next bounded check and reviewer: ___________________________ 8. REFERENCES AND LIMITS Current contracts: https://docs.cartesia.ai/use-the-api/stt/turns https://docs.cartesia.ai/api-reference/stt/turns/websocket https://developers.deepgram.com/docs/flux/configuration https://developers.deepgram.com/docs/flux/voice-agent-eager-eot Historical original comparison: https://benchmarks.cekura.ai/stt/compare/cartesia-ink-2-vs-deepgram-flux-en September 24 results do not establish a latest-model or native Burki winner. Public source configurations include manual finalization; this is not a measured natural eager-turn comparison.